Louisville Water Company provides a 6-month bid history online. You can also visit the ePlanroom for current bid opportunities. If you need more information, contact Procurement Services.
Bids Under Review: ***The presence of bid tabulations is not an express or implied representation by the Louisville Water Company, and must not be interpreted as a guarantee, endorsement, or warranty of contract award and may not result in contract award. Bids with status currently "Under Review" require approval(s) before final contact award is authorized.***
Open Date | Bid No. | Bid Title | Buyer | Status |
2/24/2021 | 21-09 | Stonestreet Road Area Water Main Replacement Project | Terri Young | Under Review |
2/24/2021 | 20-121 | New Services | Renee Fromme | Under Review |
2/24/2021 | 21-08 | Southwest Jefferson County - Lower Hunters Trace 20 inch Main Project | Renee Fromme | Under Review |
2/10/2021 | 21-05 | Copper Tubing | Renee Fromme | Awarded |
2/10/2021 | 21-11 | Resilient Seated Gate and Wheel Valves | Terri Young | Awarded |
1/27/2021 | 20-112 | Crescent Hill WTP North/South Filter Building Renovation | Terri Young | Under Review |
12/30/2020 | 20-131 | Frankfort Avenue Large Diameter Horizontal Gate Valve | Renee Fromme | Awarded |
12/9/2020 | 20-122 | North Nelson Master Meter Access Project | Robin Heitz | No Bids Received |
11/11/2020 | 20-114 | Water Bottles, 22 oz. | Robin Heitz | Awarded |
10/21/2020 | 20-106 | Zorn Pump Station #3 Interior Railing Modifications | Renee Fromme | Awarded |
10/21/2020 | 20-23 | Frames & Covers and Monitor Castings | Terri Young | Awarded |
9/23/2020 | 20-58 | 8331 Cane Run Road Project | Renee Fromme | Awarded |
9/16/2020 | 20-24 | Brass Fittings and Valves | Terri Young | Awarded |
9/9/2020 | 20-56 | Newburg Road Water Main Replacement Project | Renee Fromme | Awarded |
9/9/2020 | 20-104 | Preston Highway Spoil Site Improvements Project | Terri Young | Awarded |
9/2/2020 | 20-103 | CArdinal Hill Drainage Project | Renee Fromme | Awarded |
9/2/2020 | 20-100 | Grid-Tie Farm Spring Drive to Wolf Pen Lane | Terri Young | Awarded |
8/26/2020 | 20-97 | B.E. Payne Water Treatment Plant Chlorine Dioxide Generation System | Terri Young | Awarded |
8/19/2020 | 20-35 | Tapping Saddles for PVC and Ductile Iron Pipe | Renee Fromme | Awarded |
8/12/2020 | 20-74 | Water Treatment Chemicals | Renee Fromme | Swarded |
8/12/2020 | 20-19 | Aluminum Hatches | Terri Young | Awarded |
8/5/2020 | 20-46 | Cold Water Meters | Renee Fromme | Awarded |
8/5/2020 | 20-94 | River Bluff Temp BPS Demolition | Renee Fromme | Awarded |
7/22/2020 | 20-92 | Ol Hwy 1793 PRV Site Improvement | Renee Fromme | Awarded |
7/22/2020 | 20-80 | Preston Highway 24 Inch Section 6 Project | Terri Young | Awarded |
7/8/2020 | 20-22 | Swing Check Valves | Terri Young | Awarded |
7/8/2020 | 20-21 | Valve Boxes, Lids & Risers | Terri Young | Awarded |
6/24/2020 | 20-79 | 60 Inch Gate Valve and Grid Tie Project | Terri Young | Awarded |
6/17/2020 | 20-59 | Reamers Road Tank Coating Renovation | Renee Fromme | Awarded |
6/10/2020 | 20-53 | 690 Plan: I65 Area | Robin Heitz | Awarded |
5/27/2020 | 20-54 | Pumpkin PRV | Renee Fromme | Awarded |
5/20/2020 | 20-18 | Water Pressure Regulators | Terri Young | Awarded |
5/20/2020 | 20-17 | Flat Faced Flanged Spool | Terri Young | Awarded |
5/20/2020 | 20-16 | Distribution System Repairs & Capital Improvements | Terri Young | Awarded |
5/13/2020 | 20-45 | Tapping Sleeves with MJ Outlets | Renee Fromme | Awarded |
5/6/2020 | 20-50 | Finley Hill Access Improvements | Robin Heitz | Awarded |
4/15/2020 | 20-06 | 690 Plan: Preston Highway | Terri Young | Awarded |
4/8/2020 | 20-28 | Campground Road ARea MRRP | Renee Fromme | Awarded |
3/18/2020 | 20-29 | MJ Restrained Joint Adapters | Renee Fromme | Awarded |
03/03/2020 | 20-27 | Hudson Lane Area Water Main Replacement Project | Robin Heitz | Awarded |
02/26/2020 | 20-15 | Propylene Glycol | Robin Heitz | Awarded |
2/19/2020 | 20-13 | Minor Lane Area Main Replacement Project | Renee Fromme | Awarded |
2/12/2020 | 20-07 | Kenilworth Road Area Main Replacement Project | Terri Young | Awarded |
2/5/2020 | 20-08 | Ductile Iron Pipe | Renee Fromme | Awarded |
2/5/2020 | 20-09 | Copper Tubing | Renee Fromme | Awarded |
2/5/2020 | 20-05 | Beech Valley Ct. 2/3 Majority Petition | Robin Heitz | Awarded |
1/29/2020 | 20-02 | Harrods Cove Pressure Reducing Valve Station | Terri Young | Awarded |
1/22/2020 | 20-01 | Site Restoration | Terri Young | Awarded |
1/08/2020 | 19-115 | Greenbelt Hwy & Logistics Drive Grid Tie | Renee Fromme | Awarded |
12/18/2019 | 19-112 | Billtown Tank Fence | Robin Heitz | Awarded |
12/11/2019 | 19-109 | North Shelby #1 Master Meter Renovation Project | Terri Conner | Awarded |
12/04/2019 | 19-77 | 690 Plan Belmont Road Project | Renee Fromme | Awarded |
11/22/2019 | 19-106 | Horizontal Directional Drilling | Renee Fromme | Awarded |
11/6/2019 | 19-59 | Billtown Tank Fence | Robin Heitz | All Bids Rejected |
10/23/2019 | 19-102 | Tanglewood Pressure Reducing Valve Station | Terri Conner | Awarded |
9/19/2019 | 19-0919 | Paving Restoration (Joint Bid with MSD) | Terri Conner | Awarded |
9/18/2019 | 19-95 | Belmont Booster Pump Station | Renee Fromme | Awarded |
9/04/2019 | 19-93 | Rebar Anchor | Renee Fromme | Awarded |
8/28/2019 | 19-92 | Propylene Glycol | Robn Heitz | Awarded |
8/14/2019 | 19-76 | East Manslick Road Area Water Main Replacement Project | Robin Heitz | Awarded |
8/14/2019 | 19-73 | 660 Plan South West Jefferson County Improvements - Greenbelt Highway: 10901 Greenbelt Highway to Johnsontown Road Project | Terri Conner | Awarded |
8/07/2019 | 19-66 | Water Treatment Chemicals - Ft. Knox Locations | Renee Fromme | Awarded |
8/07/2019 | 19-10 | Zorn Pump Standby Generator | Renee Fromme | Awarded |
7/31/2019 | 19-51 | Swing Check Valves | Terri Conner | Awarded |
7/31/2019 | 19-90 | Dogwood Boulevard Two Thirds Majority Petition | Terri Conner | Awarded |
7/31/2019 | 19-60 | 660 Plan Southwest Jefferson county Improvement - Greenbelt Highway Transmission Main Project | Robin Heitz | Awarded |
7/31/2019 | 19-64 | Water Treatment Chemicals | Renee Fromme | Awarded |
7/24/2019 | 19-74 | Mermaid Lane (Ford Truck Plant) Water Main Replacement | Renee Fromme | Awarded |
7/24/2019 | 19-71 | Barricades, Cones, and Lights Purchase | Robin Heitz | Awarded |
7/10/2019 | 19-45 | Plumbing Services | Robin Heitz | Awarded |
7/10/2019 | 19-50 | Spring Loaded Detector Check Valves | Terri Conner | Awarded |
7/10/2019 | 19-49 | Valve Boxes, Lids & Risers | Terri Conner | Awarded |
7/10/2019 | 19-70 | Cabin Creek Booster Pumping Station Replacement | Terri Conner | Awarded |
6/26/2019 | 19-69 | Hawley Gibson Road Area Main Replacement Project | Robin Heitz | Awarded |
6/19/2019 | 19-54 | Crescent Hill Filter Plant - chemical Building Renovation - Phase 1 | Robin Heitz | Awarded |
6/19/2019 | 19-31 | Hydraulic, Machine & Gear Oils | Terri Conner | Awarded |
5/29/2019 | 19-55 | 41st Street Area MRRP | Renee Fromme | Awarded |
5/15/2019 | 19-32 | River Bluff Road Grid Tie Water Main Replacement Project | Terri Conner | Awarded |
5/8/2019 | 19-53 | Plastic Meter Vaults & Extension Rings | Robin Heitz | Awarded |
5/1/2019 | 19-42 | Cedar Grove PRV Station | Robin Heitz | Awarded |
4/24/2019 | 19-44 | Restraint Joint Clamps | Robin Heitz | Awarded |
4/17/2019 | 19-26 | Glenview Avenue Area Water Main Replacement Project | Terri Conner | Awarded |
4/17/2019 | 19-01 | Brokerage Services for Medical, Dental, Medicare HMO/Supplement, Short/Long Term Disability and Life Insurance (Group, AD&D, Supplemental, & Dependent) | Robin Heitz | Awarded |
4/10/2019 | 19-16 | Stonestreet Road Area Grid-Ties Project | Robin Heitz | Awarded |
4/3/2019 | 19-17 | Garden Green Way Area MRRP | Renee Fromme | Awarded |
3/29/2019 | 19-39 | Cardinal Hill Slope Stability Projectq | Renee Fromme | Awarded |
3/27/2019 | 19-25 | PVC Pipe & Ductile Iron Pipe | Renee Fromme | Awarded |
3/20/2019 | 19-34 | Private/Informal Bid: Glenmary Avenue Area Phase II Lead Service Renewal Project | Terri Conner | Awarded |
3/13/2019 | 19-27 | Stone, Soil, and Sand | Renee Fromme | Awarded |
3/6/2019 | 19-14 | Copper Tubing | Renee Fromme | Awarded |
2/27/2019 | 19-24 | Lead Tailpiece Service Renewals | Robin Heitz | Awarded |
2/20/2019 | 19-03 | Central Jefferson County Area Lead Service Renewals | Terri Conner | Awarded |
2/13/2019 | 19-04 | East Jefferson County Area Lead Service Renewals | Terri Conner | Awarded |
2/6/2019 | 19-05 | Northwest Jefferson County Area LSR | Renee Fromme | Awarded |
2/6/2019 | 19-07 | Eastern Parkway 48-Inch Transmission Main Rehabilitation Phase 3 | Robin Heitz | Awarded |
1/30/2019 | 19-09 | Gate and Wheel Valves | Terri Conner | Awarded |
1/30/2019 | 18-129 | Lime Unloading System Renovation at BEPWTP | Renee Fromme | Awarded |
1/30/2019 | 19-06 | 14009 Fairway Lane Water Main Relocation Project | Terri Conner | Awarded |
1/30/2019 | 18-131 | Highway 1793 Tank & Goshen Booster Pump Station Demolition | Robin Heitz | Awarded |
12/19/2018 | 18-124 | Rollingwood Booster Pump Station Renovation | Renee Fromme | Awarded |
11/28/2018 | 18-119 | Glaser Lane Area Water Main Replacement Project | Robin Heitz | Awarded |
11/21/2018 | 18-113 | Springhill Road Area Water Main Replacement Project | Terri Conner | Awarded |
11/21/2018 | 18-110 | Taylorsville Bardstown Road Master Meter Renovation Project | Terri Conner | Awarded |
11//21/2018 | 18-112 | Southland Blvd.MRRP | Renee Fromme | Awarded |
10/24/2018 | 18-93 | Employee Assistance Program Services | Renee Fromme | Awarded |
10/17/2018 | 18-96 | Concrete Paved Services | Terri Conner | Awarded |
10/10/2018 | 18-98 | Hdro-Vac Excavator Truck | Renee Fromme | All Bids Rejected |
9/19/2018 | 18-95 | HVAC, Inspection, Maintenance, & Repairs | Renee Fromme | Awarded |
8/22/2018 | 18-70 | Casing Spacers | Renee Fromme | Awarded |
8/15/2018 | 18-89 | Copper Tubing | Renee Fromme | Awarded |
12/05/2018 | 18-88 | Property Protection - Security Services for LWC facilities | Renee Fromme | Awarded |
8/15/2018 | 18-73 | Carbon Fiber-Reinforced Polymer Repairs on Large Diameter Water Mains | Terri Conner | Awarded |
8/15/2018 | 18-74 | External Post-Tensioning Tendon Repairs on Large Diameter PCCP Water Main | Terri Conner | Awarded |
8/01/2018 | 18-76 | Water Treatment Chemicals | Renee Fromme | Awarded |
7/18/2018 | 18-75 | Swing Check Valves | Carol Lyons | Awarded |
7/11/2018 | 18-80 | 48" Bell Joint Clamps | Carol Lyons | Awarded |
6/27/2018 | 18-65 | Polywrap | Carol Lyons | Awarded |
6/20/2018 | 18-50 | Janitorial Services | Renee Fromme | Awarded |
6/13/2018 | 18-69 | South Park BPS and Hollyvilla PRV Weathertightness Improvements | Terri Conner | Awarded |
6/6/2018 | 18-71 | Hydraulic, Machine & Gear Oils | Terri Conner | Awarded |
6/6/2018 | 18-66 | Parkridge Tank Coatings & REnovation | Renee Fromme | Awarded |
5/16/2018 | 18-22 | Mitchell Hill Road Water Main Replacement | Renee Fromme | Awarded |
5/16/2018 | 18-63 | Forest Park Drive Area Water Main Replacement | Robin Heitz | Awarded |
5/09/2018 | 18-64 | 10 Yard Mobile Mixing Concrete Truck | Renee Fromme | Awarded |
5/2/2018 | 18-59 | Bush Farm Road Grid Tie | Renee Fromme | Awarded |
5/2/2018 | 18-19 | Uniforms | Robin Heitz | Awarded |
4/18/2018 | 18-55 | Inspection, Maintenance & Repair of Elevators at Louisville Water Company | Terri Conner | Awarded |
4/11/2018 | 18-57 | Allmond Avenue Warehouse Racking Equipment | Terri Conner | Awarded |
4/11/2018 | 18-58 | Cement | Robin Heitz | Awarded |
4/11/2018 | 18-48 | Electro-Mechanical | Renee Fromme | Awarded |
3/28/2018 | 18-52 | Aluminum Hatches | Terri Conner | Awarded |
3/28/2018 | 18-51 | Flat Faced Flanged Spool Pieces | Terri Conner | Awarded |
3/28/2018 | 18-28 | Windsor Place Area Lead Service Renewal Project | Robin Heitz | Awarded |
3/21/2018 | 18-49 | I-64 36 Inch Steel Impressed Current Cathodic Protection System Installation | Terri Conner | Awarded |
3/20/2019 | 19-34 | Private/Informal Bid: Glenmary Avenue Area Phase II Lead Service Renewal Project | Terri Conner | Awarded |
3/14/2018 | 18-31 | Distribution System Repairs and Capital Improvements | Terri Conner | Awarded |
3/7/2018 | 18-17 | Shelburn Drive Area Water Main Replacement | Renee Fromme | Awarded |
3/7/2018 | 18-29 | Emil Avenue Lead Service Renewals | Renee Fromme | Awarded |
3/7/2018 | 18-25 | Eastern Parkway 48" Transmission Main Rehabilitation Phase 2B | Robin Heitz | Awarded |
2/28/2018 | 18-27 | Central Avenue ARea Lead Service Renewals Project | Renee Fromme | Awarded |
2/28/2018 | 18-26 | Woodlawn Avenue Area Lead Service Renewals Project | Terri Conner | Awarded |
2/28/2018 | 18-21 | Rustic Way Area Water Main Relacements | Robin Heitz | Awarded |
2/21/2018 | 18-20 | Southwestern Parkway Area Water Main Replacement Project | Terri Conner | Awarded |
2/14/2018 | 18-08 | South 4th Street Area Lead Service Renewals | Robin Heitz | Awarded |
2/14/2018 | 18-07 | Forrest Street Area Lead Service Renewals | Terri Conner | Awarded |
2/14/2018 | 17-159 | Blankenbaker Parkway Water Main Replacements | Robin Heitz | Awarded |
2/7/2018 | 18-02 | Temporary Personnel and Direct Hire Placement Services | Terri Conner | Awarded |
2/7/2018 | 18-12 | Seelbach Avenue MRRP | Renee Fromme | Awarded |
2/7/2018 | 18-11 | Farmington Avenue Water Main Replacement Project | Terri Conner | Awarded |
2/7/2018 | 18-06 | West Oak Street Area Lead Service Renewals | Renee Fromme | Awarded |
2/7/2018 | 18-05 | Hawthorne Avenue Area Lead Service Renewals | Robin Heitz | Awarded |
1/31/2018 | 18-03 | Glenmary Avenue Area Lead Service Renewals | Terri Conner | Awarded |
1/31/2018 | 18-04 | Macon Avenue Area Lead Service Renewals | Robin Heitz | Awarded |
1/31/2018 | 18-09 | Rivercrest Drive MRRP | Renee Fromme | Awarded |
1/31/2018 | 18-10 | Virginia Avenue Area Water Main Repacements | Robin Heitz | Awarded |
1/24/2018 | 18-16 | Long Run Park Road and Shelbyville Road Grid-Ties Project | Terri Conner | Awarded |
1/26/2018 | 18-15 | Ductile Iron Pipe Restrained Joint Gaskets | Renee Fromme | Awarded |
1/10/2018 | 18-14 | Copper Tubinig | Renee Fromme | Awarded |
12/20/2017 | 17-156 | 680 Plan - Highwawy 42 Water Main Installation | Terri Conner | Awarded |
12/20/2017 | 17-152 | Steel Casing Pipe | Robin Heitz | Awarded |
12/20/2017 | 17-150 | Transmission System Repairs and/or Capital Improvements | Robin Heitz | Awarded |
12/13/2017 | 17-71 | Construction Inspection Services | Terri Conner | Awarded |
12/6/2017 | 17-155 | PVC Pipe | Renee Fromme | Awarded |
12/6/2017 | 17-154 | Ductile Iron Water Main Pipe | Renee Fromme | Awarded |
11/29/2017 | 17-149 | RBF Pump Modifications at B.E. Paye Water Treatment Plant | Robin Heitz | Awarded |
11/29/2017 | 17-140 | Crew Truck with Crane | Renee Fromme | Awarded |
11/29/2017 | 17-115 | Potable Water Tank Miscellaneous Modifications & Repairs | Renee Fromme | Awarded |
11/29/2017 | 17-78 | Crescent Hill WTP Standby Generator Project | Renee Fromme | Awarded |
11/22/2017 | 17-145 | Propylene Glycol | Robin Heitz | Awarded |
11/8/2017 | 17-138 | Constantine PRV Replacement | Terri Conner | Awarded |
11/8/2017 | 17-139 | Wolf Pen Woods PRV | Robin Heitz | Awarded |
10/18/2017 | 17-130 | John L. Huber Building Standby Generator | Robin Heitz | Awarded |
10/18/2017 | 17-129 | Fire Hydrants | Terri Conner | Awarded |
10/11/2017 | 17-122 | Barricade Rental, Worksite Security, and Safety Sign Purchase | Robin Heitz | Awarded |
10/11/2017 | 17-131 | Bethany Valve | Bart Potts | Awarded |
9/27/2017 | 17-120 | Bank Stabilization at Collector Well #5 | Terri Conner | Awarded |
9/27/2017 | 17-119 | N. Buckeye Lane Main Extension and Little Goose Creek Crossing at Barbour Lane | Terri Conner | Awarded |
9/27/2017 | 17-116 | Oak Hill Booster Pump Station | Robin Heitz | Awarded |
9/27/2017 | 17-108 | Sale of Scrap Metal | Robin Heitz | Awarded |
9/20/2017 | 17-117 | Peaceful Valley Tank Rehabilitation | Renee Fromme | Under Review |
9/20/2017 | 17-111 | Cement Silo Replacement | Renee Fromme | Awarded |
9/13/2017 | 17-104 | Halls Hill Water Main Extension | Renee Fromme | Awarded |
9/13/2017 | 17-102 | I-64 Transmission Main | Terri Conner | Awarded |
9/6/2017 | 17-113 | Polywrap | Robin Heitz | Awarded |
9/6/2017 | 17-100 | Advanced Metering Infrastructure (AMI) Installation and Implementation | Terri Conner | Awarded |
9/6/2017 | 17-92 | North Shelby II Master Meter | Robin Heitz | Awarded |
8/23/2017 | 17-109 | Thierman Lane Water Main Transmission Project | Robin Heitz | Awarded |
8/23/2017 | 17-105 | Bardstown Elevated Water Storage Tank | Terri Conner | Awarded |
8/23/2017 | 17-103 | Insulated Concrete Forms | Renee Fromme | Awarded |
8/16/2017 | 17-101 | Switchgear Testing/Inspection/Cleaning/Repairs | Renee Fromme | Awarded |
8/2/2017 | 17-97 | Little Goose Creek Crossing Water Main Replacement | Renee Fromme | All Bids Rejected |
7/26/2017 | 17-99 | Water Treatment Chemicals | Renee Fromme | Awarded |
7/19/2017 | 17-96 | Bethany Booster Pumping Station | Terri Conner | Awarded |
7/19/2017 | 17-74 | Roy Wilkins Avenue Area LSR | Robin Heitz | Awarded |
7/12/2017 | 17-94 | N. 25th Street Area LSR | Renee Fromme | Awarded |
6/28/2017 | 17-93 | Bluegrass Avenue Area Lead Service Renewals | Robin Heitz | Awarded |
6/21/2017 | 17-90 | Eastern Parkway Area Water Main Replacement Project | Terri Conner | Awarded |
6/21/2017 | 17-89 | Copper Tubing | Renee Fromme | Awarded |
6/21/2017 | 17-77 | Potable Water Tank Cleaning & Inspection Services | Renee Fromme | Awarded |
6/21/2017 | 17-88 | Atwood Street Area Lead Service Renewals | Robin Heitz | Awarded |
6/21/2017 | 17-87 | Oxford Place Lead Service Renewals | Renee Fromme | Awarded |
6/7/2017 | 17-82 | Barricades, Cones & Lights Purchase | Robin Heitz | Awarded |
5/24/2017 | 17-75 | H2infO Intranet Upgrade and Improvements | Robin Heitz | Awarded |
5/3/2017 | 17-73 | Rose Island/Rose Wycombe Water Main Installation Project | Terri Conner | Awarded |
5/3/2017 | 17-67 | Prospect I (680 PZ) & Prospect II (770 PZ) | Renee Fromme | Awarded |
4/26/2017 | 17-66 | CH Masonry Improvements for Chemical/Lab/Main Office Buildings | Renee Fromme | Awarded |
4/19/2017 | 17-44 | Rose Island Pressure Reducing Valve Station | Renee Fromme | Awarded |
4/19/2017 | 17-65 | Plastic Meter VAults & Extension Rings | Robin Heitz | Awarded |
4/19/2017 | 17-63 | Brooks Hill Elevated Water Storage Tank | Robin Heitz | Awarded |
4/19/2017 | 17-48 | Tenny Avenue Area Water Main Replacement Project | Terri Conner | Awarded |
4/19/2017 | 17-39 | Nichols Drive Area Main Replacement | Robin Heitz | Awarded |
4/12/2017 | 17-14 | Ductile Iron Fittings & Accesories | Renee Fromme | Awarded |
4/12/2017 | 17-60 | Zorn Pump Station #3 Restoration | Renee Fromme | Awarded |
4/12/2017 | 17-33 | West Shelby Master Meter | Robin Heitz | Awarded |
4/5/2017 | 17-07 | Bardstown Road Area Lead Service Renewals | Terri Conner | Awarded |
4/5/2017 | 17-61 | Contingency Contract for Motor Repairs | Robin Heitz | Awarded |
4/5/2017 | 17-12 | Security Services for 3rd Street | Renee Fromme | Awarded |
3/29/2017 | 17-13 | Engineer of Record | Renee Fromme | Awarded |
3/29/2017 | 17-57 | Speed Avenue Area Lead Service Renewals | Robin Heitz | Awarded |
3/29/2017 | 17-62 | Cement | Robin Heitz | Awarded |
3/22/2017 | 17-55 | Winston Avenue Area LSR | Renee Fromme | Awarded |
3/22/2017 | 17-49 | Bradbe Road Water Main Relocation | Robin Heitz | Awarded |
3/08/2017 | 17-40 | Lexington Road Area main Replacement | Renee Fromme | Awarded |
3/08/2017 | 17-38 | New Lagrange Road area Main Replacement | Renee Fromme | Awarded |
3/01/2017 | 17-02 | Replace Intercom System | Renee Fromme | Awarded |
3/01/2017 | 17-35 | Hwy 1793 Water Main Installation | Renee Fromme | Awarded |
3/01/2017 | 17-32 | Sludge Hauling - Ft. Knox | Renee Fromme | Awarded |
3/01/2017 | 17-43 | Magazine Street area LSR | Renee Fromme | Awarded |
2/22/2017 | 17-01 | Notification and Collections of Delinquent Accounts | Robin Heitz | All Bids Rejected |
2/22/2017 | 17-06 | Hudson Lane Water Main Replacement | Robin Heitz | Awarded |
2/22/2017 | 17-37 | Lantana Drive Area Main Replacement | Robin Heitz | Awarded |
2/15/2017 | 17-05 | River Park Drive Area Lead Service Renewals | Robin Heitz | Awarded |
2/15/2017 | 17-10 | Right Hand Drive Utility Vehicles (Two and Four Door Models) | Robin Heitz | Awarded |
2/8/2017 | 16-175 | Ready Mix Concrete | Robin Heitz | Awarded |
2/8/2017 | 17-09 | Goshen Temporary Booster Pump Sstation | Renee Fromme | Awarded |
1/25/2017 | 16-179 | Kosmosdale Tank Coatings Renovation | Robin Heitz | Awarded |
1/18/2017 | 16-169 | Portland Basin Water Main Extension | Renee Fromme | Awarded |
1/18/2017 | 17-04 | Copper Tubing | Renee Fromme | Awarded |
1/4/2017 | 16-177 | Steel Casing Piping | Robin Heitz | Awarded |
1/4/2017 | 16-178 | Polywrap | Robin Heitz | Awarded |
12/21/2016 | 16-174 | Brooks Hill Water Tower Demo & Build | Renee Fromme | Reject All Bids |
12/14/2016 | 16-22 | Major Engine & Transmission Repairs - Under One Ton | Robin Heitz | Awarded |
12/14/2016 | 16-23 | Major Engine & Transmission Repairs - One Ton & Over | Robin Heitz | Awarded |
12/14/2016 | 16-173 | 48" Bell Joint Clamps | Robin Heitz | Awarded |
12/14/2016 | 16-170 | Soil, Stone, Mfgd Sand, and Concrete Sand | Renee Fromme | Awarded |
11/30/2016 | 16-165 | PVC Pipe | Renee Fromme | Awarded |
11/30/2016 | 16-164 | Ductile Iron Pipe | Renee Fromme | Awarded |
11/30/2016 | 16-144 | Southside Drive Area Water Main Replacement Project | Terri Conner | Awarded |
11/9/2016 | 16-162 | Hydraulic, Machine & Gear Oils | Terri Conner | Awarded |
11/09/2016 | 16-155 | Pipeline and Ferrous Metal Detector | Robin Heitz | Awarded |
11/09/2016 | 16-160 | 48" & 60" Horizontal Gate Valves | Renee Fromme | Awarded |
11/02/2016 | 16-154 | Plate Trucks | Terri Conner | Awarded |
11/02/2016 | 16-159 | Water Treatment Chemicals- Liquidd Carbon Dioxide | Renee Fromme | Awarded |
11/02/2016 | 16-145 | Fort Knox Lagoon #4 - Residual Removal | Renee Fromme | Awarded |
10/19/2016 | 16-152 | Vehicle Wash Supplies | Robin Heitz | Awarded |
10/19/2016 | 16-153 | Manhole Frames & Covers | Robin Heitz | Awarded |
10/5/2016 | 16-146 | Mt. Washington Highway 44 Master Meter | Terri Conner | Awarded |
10/5/2016 | 16-119 | Ft. Knox - Water Treatment Chemicals | Renee Fromme | Awarded |
9/28/2016 | 16-142 | Frankfort Avenue Area Lead Service Renewals | Robin Heitz | Awarded |
9/28/2016 | 16-141 | Valve and Meter Box Maintenance | Renee Fromme | Awarded |
9/28/2016 | 16-147 | Fencing for Clear Run Road Property | Renee Fromme | Awarded |
9/21/2016 | 16-126 | Contingency Contract for Pump Repairs | Robin Heitz | Awarded |
9/14/2016 | 16-122 | Cisco Maintenance Contract Renewals | Terri Conner | Awarded |
9/14/2016 | 16-54 | Belmont Road Grid Tie | Terri Conner | Awarded |
9/14/2016 | 16-01 | Roof Consulting Services | Renee Fromme | Awarded |
9/14/2016 | 16-132 | Coffee Services | Robin Heitz | Awarded |
8/31/2016 | 16-03 | Transmission Pipeline System Design Engineering Services | Terri Conner | Awarded |
8/24/2016 | 16-20 | Old Henry Road Water Main Grid-Tie Project | Robin Heitz | Awarded |
8/17/2016 | 16-124 | Minor Lane 30-Inch Grid Tie and N. English Station Road 36-Inch Grid Tie | Terri Conner | Awarded |
8/17/2016 | 16-131 | Concrete Paved Services | Terri Conner | Awarded |
08/17/2016 | 16-125 | Allmond Truck Wash Roof Replacement & Masonry Improvements | Robin Heitz | Awarded |
08/10/2016 | 16-21 | CIS Analytics | Renee Fromme | Awarded |
08/03/2016 | 16-128 | ARC Flash Personal Protection Equipment | Renee Fromme | Awarded |
08/03/2016 | 16-118 | Water Treatment Chemicals | Renee Fromme | Awarded |
07/27/2016 | 16-127 | Propylene Glycol | Robin Heitz | Awarded |
07/20/2016 | 16-91 | Switchgear Rehabilitation at Crescent Hill & Zorn Pump Station | Renee Fromme | Awarded |
07/20/2016 | 16-116 | Copper Tubing | Renee Fromme | Awarded |
07/20/2016 | 16-113 | Repair Couplings & Gaskets | Renee Fromme | Awarded |
07/20/2016 | 16-112 | Rebar Anchors | Renee Fromme | Awarded |
07/20/2016 | 16-111 | Casing Spacers | Renee Fromme | Awarded |
7/13/2016 | 16-120 | Eastern Parkway 48-Inch Transmission Main Rehabilitation Phase I | Terri Conner | Awarded |
7/13/2016 | 16-106 | Davids Drive Grid-Tie | Robin Heitz | Awarded |
7/13/2016 | 16-110 | Pipe Repair Sleeves | Renee Fromme | Awarded |
7/13/2016 | 16-109 | Meter Setters | Renee Fromme | Awarded |
7/6/2016 | 16-15 | Swing Check Valves | Terri Conner | Awarded |
6/22/2016 | 16-108 | Algonquin Parkway and Story Avenue MRRP | Robin Heitz | Awarded |
6/22/2016 | 16-84 | RFP - Oracle Work and Asset Management (WAM) Solution Implementation Services | Renee Fromme | Under Review |
6/15/2016 | 16-83 | M/WBE Availability Study | Renee Fromme | Awarded |
6/15/2016 | 16-105 | Westport Road Tank and Oak Hill Tank Coatings Renovation | Terri Conner | Awarded |
06/08/2016 | 16-102 | Steel Casing Piping | David Collier | Awarded |
06/08/2016 | 16-95 | 5000# Lift Capacity, LP Gas Powered Forklifts | Brian Matherly | Awarded |
06/01/2016 | 16-96 | BEPWTP RBF Building Roof Replacement & Masonry Improvements | Renee Fromme | Awarded |
06/01/2016 | 16-83 | MWBE Availability Study | Renee Fromme | Awarded |
5/25/2016 | 16-103 | Aluminum Hatches | Terri Conner | Awarded |
5/25/2016 | 16-97 | Preston Highway Water Main Replacements | Robin Heitz | Awarded |
5/18/2016 | 16-94 | Kenwood Area Cured in Place Pipe Project | Renee Fromme | All Bids Rejected |
5/4/2016 | 16-81 | Cooper Chapel 16" Water Main Installation | Robin Heitz | Awarded |
5/4/2016 | 16-60 | Bells Lane Water Main Replacement | Robin Heitz | Awarded |
4/27/2016 | 16-82 | MJ Restraint Joint Adapters | Renee Fromme | Awarded |
4/27/2016 | 16-80 | Windsor Forest-Parkridge Grid Tie | Renee Fromme | Awarded |
4/27/2016 | 16-11 | Flat Faced Spool Flanges | Robin Heitz | Awarded |
4/13/2016 | 16-77 | Goldsmith Lane Area MRRP | Renee Fromme | Awarded |
4/6/2016 | 16-48 | Skid Mounted Air Compressors | Terri Conner | Awarded |
4/6/2016 | 16-76 | Portland Avenue Area MRRP | Robin Heitz | Awarded |
4/6/2016 | 16-59 | Graston Avenue Area Water Main Replacement | Robin Heitz | Awarded |
3/30/2016 | 16-05 | Caterer in Residence / Event Management Services for LWTP | Renee Fromme | Awarded |
3/9/2016 | 16-52 | Third Street Area Lead Service Renewals Project | Robin Heitz | Awarded |
3/2/2016 | 16-50 | Oak Street Area MRRP | Renee Fromme | Awarded |
3/2/2016 | 16-47 | Rowan Street Area Lead Service Renewals | Terri Conner | Awarded |
2/24/2016 | 16-46 | South Brook Street Area Lead Service Renewals | Robin Heitz | Awarded |
2/17/2016 | 16-41 | Muhammad Ali Area MRRP | Renee Fromme | Awarded |
2/17/2016 | 16-40 | West Main Street Area Lead Service Renewals | Robin Heitz | Awarded |
2/12/2016 | 16-35 | Lebanon Junction Master Meter 4 ( 20" Transmission Main to HCWD #2) | Terri Conner | Awarded |
2/3/2016 | 16-37 | Polywrap | David Collier | Under Review |
2/3/2016 | 16-10 | Restraint Joint Clamps | David Collier | Under Review |
1/27/2016 | 16-06 | Lexington Road Bridge Main Replacement | Renee Fromme | Awarded |
01/20/2016 | 16-07 | Grid-Tie Raymond Road, Wilderness Trail to HWY 44 | Robin Heitz | Awarded |
12/30/2015 | 15-170 | Zorn Pump Station - Install Screen #1 Foot Shaft Assembly | Terri Conner | Awarded |
12/23/2015 | 15-143 | Horizontal Directional Drilling | Renee Fromme | Awarded |
12/16/2015 | 15-168 | Stone, Soil, Mfg. Sand Coarse Concrete Sand | Renee Fromme | Awarded |
12/16/2015 | 15-153 | Allmond Avenue Inspector's Office Improvements | Robin Heitz | Awarded |
12/9/2015 | 15-167 | PVC Pipe | David Collier | Under Review |
12/9/2015 | 15-166 | Ductile Iron Pipe | David Collier | Under Review |
12/9/2015 | 15-125 | Lime System Improvements at Crescent Hill Water Treatment Plant | Terri Conner | Awarded |
11/18/2015 | 15-100 | Hydraulic, Machine & Gear Oils | Terri Conner | Awarded |
11/4/2015 | 15-139 | Corporate Wellness Program | Renee Fromme | Awarded |
11/4/2015 | 15-145 | Copper Tubing | David Collier | Under Review |
11/4/2015 | 15-146 | Steel Casing Pipe | David Collier | Under Review |
10/28/2015 | 15-126 | Cedar Grove Tank Modifications | Robin Heitz | Awarded |
10/28/2015 | 15-137 | CHWTP Fluoride Bldg - Roof Replacement and Masonry Improvements | Renee Fromme | Awarded |
10/21/2015 | 15-124 | Transmission-Mellwood Avenue 30" Clean & Cement Lining Project | Terri Conner | Awarded |
9/30/2015 | 15-116 | Water Treatment Chemicals - Ft. Knox | Renee Fromme | Awarded |
9/30/2015 | 15-127 | Frames and Covers and Riser Rings | David Collier | Under Review |
9/23/2015 | 15-123 | CHGM & CHPS Office Lighting Replacement | Renee Fromme | Awarded |
8/26/2015 | 15-113 | Compostable Cups, 8 oz. and 12 oz. | Robin Heitz | Awarded |
8/26/2015 | 15-115 | Allmond Avenue Pavements Improvements for Material yard Storate | Robin Heitz | Awarded |
8/19/2015 | 15-82 | Brass Valves and Fittings | David Collier | Under Review |
8/19/2015 | 15-38 | Water Bottles, 16 oz. and 22 oz. | Robin Heitz | Awarded |
8/19/2015 | 15-81 | Tapping Sadles | David Collier | Under Review |
08/12/2015 | 15-45 | IT Consulting Servicews | Obe Everett | Awarded |
8/12/2015 | 15-111 | 24-Inch PCCP Replacement After Condition Assessment | Terri Conner | Awarded |
8/5/2015 | 15-110 | Water Treatment Chemicals | Renee Fromme | Awarded |
7/22/2015 | 15-99 | Crew Truck Cab & Chassis | Robin Heitz | Awarded |
7/15/2015 | 15-80 | Propylene Glycol | David Collier | Under Review |
7/15/2015 | 15-79 | Barricades, Lights and Traffic Cones | David Collier | Under Review |
7/8/2015 | 15-98 | 680 Plan Highway 42 16" Transmission Main (Prospect PRV Station to greenmere Blvd) | Renee Fromme | Under Review |
7/8/2015 | 14-168 | Laser Printer Maintenance, Service and Supplies | Robin Heitz | Awarded |
7/8/2015 | 15-97 | 15 Ton Trailers | Terri Conner | Awarded |
7/01/2015 | 15-93 | I-64 West Area Lead Service REnewals | Renee Fromme | Under Review |
6/24/2015 | 15-90 | Heavy Equipment Rental | Renee Fromme | Under Review |
6/24/2015 | 15-87 | Fleet Brake Services | Terri Conner | Under Review |
6/17/2015 | 15-37 | Towing Services | Robin Heitz | Awarded |
6/10/2015 | 15-85 | Standard Country Club Tank Coatings | Robin Heitz | Awarded |
5/13/2015 | 15-07 | Plastic Meter Vaults and Elevator Rings | David Collier | Under Review |
5/6/2015 | 15-59 | Forest Hill Hydro-Booster Pumping Station Renovation | Renee Fromme | Under Review |
5/6/2015 | 15-18 | Poplar Level Road Area Water Main Replacement | Robin Heitz | Awarded |
5/6/2015 | 15-25 | Eastern Parkway Area Lead Service Renewals | Terri Conner | Awarded |
4/29/2015 | 15-53 | Copper Tubing | David Collier | Under Review |
4/29/2015 | 15-52 | Polywrap | David Collier | Under Review |
4/29/2015 | 15-51 | Steel Casing Pipe | David Collier | Under Review |
4/29/2015 | 15-55 | 860 PZ - English Station 3MG Elevated Water Storage Tank | Robin Heitz | Awarded |
4/15/2015 | 15-16 | Hale Avenue MRRP | Renee Fromme | Awarded |
4/15/2015 | 15-19 | I-65 Area Lead Service Renewal Project | Terri Conner | Awarded |
4/8/2015 | 15-12 | Haldeman Avenue Water Main Replacement | Robin Heitz | Awarded |
4/8/2015 | 15-24 | Cherokee Road Area Lead Service Renewals | Terri Conner | Awarded |
4/8/2015 | 15-48 | Timber Ridge & Country Lane Grid Tie | Renee Fromme | Awarded |
4/1/2015 | 15-15 | 7th Street Area Water Main Replacement | Robin Heitz | Awarded |
4/1/2015 | 15-44 | Middletown Tank Demolition | Terri Conner | Awarded |
4/1/2015 | 15-05 | Worksite Security | David Collier | Under Review |
3/25/2015 | 15-17 | Middletown Area MRRP | Carol Lyons | Awarded |
3/25/2015 | 15-06 | Water Pressure Regulators | David Collier | Under Review |
3/18/2015 | 15-32 | Grounds Maintenance and Snow Removal for LWC | Terri Conner | Awarded |
4/08/2015 | 15-13 | Harrods Creek Area Main Replacement | Renee Fromme | Bid Cancelled |
3/18/2015 | 15-31 | Beech Grove | Robin Heitz | Awarded |
3/18/2015 | 15-34 | Lake Forest Parkway 16" Water Main Installation Project | Robin Heitz | Awarded |
3/11/2015 | 15-28 | Hurstbourne Point Grid Tie | Renee Fromme | Bids Rejected |
3/4/2015 | 15-27 | Cherry Grove Grid-Tie | Renee Fromme |
Awarded |
3/4/2015 | 15-22 | Barbee Way Area Lead Service Renewals | Robin Heitz | Awarded |
3/4/2015 | 15-33 | 680 Plan - Old Highway 1793 8 Inch Water Main Installation Project | Terri Conner | Awarded |
3/4/2015 | 15-10 | Outer Loop Area Water Main Replacement Project | Terri Conner | Awarded |
2/25/2015 | 15-11 | Manslick Road Area Water Main Replacements | Renee Fromme | Awarded |
2/25/2015 | 15-23 | Fischer Avenue Area Lead Service Renewals | Terri Conner | Awarded |
2/11/2015 | 15-21 | 1st Street Area Lead Service Renewals | Renee Fromme | Awarded |
2/11/2015 | 15-29 | Site Restoration | Terri Conner | Awarded |
2/11/2015 | 15-09 | Broadway Area Water Main Replacement Project | Terri Conner | Awarded |
2/11/2015 | 15-14 | East End Area MRRP | Robin Heitz | Awarded |
1/07/2015 | 14-144 | Steel Casing, Boring & Jacking | Renee Fromme | Awarded |
1/07/2015 | 14-207 | Clermont Road 1.0 MG Elevated Water Storage | Renee Fromme | Awarded |
12/31/2014 | 14-198 | Mt. Washington Master Meter | Robin Heitz | Awarded |
12/17/2014 | 14-101 | Valve & Meter Box Maintenance | Robin Heitz | Under Review |
12/17/2014 | 14-200 | Chapeze Lane, Preston Highway, Cedar Grove Road & Clermont Road Transmission Main Installation | Terri Conner | Awarded |
12/03/2014 | 14-177 | Ductile Iron Pipe | Dave Collier | Under Review |
12/03/2014 | 14-176 | PVC Pipe | Dave Collier | Under Review |
12/03/2014 | 14-196 | Excavator and Skid Steer Replacement Tracks | Renee Fromme | Awarded |
10/08/2014 | 14-180 | Chapeze Booster Pumping Station | Carol Lyons | Under Review |
11/26/2014 | 14-174 | Vacuum Excavating Services | Renee Fromme | Awarded |
11/05/2014 | 14-181 | Smyrna Parkway Water Main Replacement Project | Renee Fromme | Awarded |
11/5/14 | 14-182 | Orange Drive Water Main Replacement Project | Robin Heitz | Awarded |
10/29/2014 | 14-130 | Tapping Sleeves with MJ Outlets | David Collier | Under Review |
10/29/2014 | 14-170 | PAC Slurry Mixing and Storage Equipment | Renee Fromme |
Awarded |
10/22/2014 | 14-172 | Rehab - 60-inch RCP - Bluegrass, Hazelwood, and Manslick | Robin Heitz | Under Review |
10/22/2014 | 14-171 | Portable PAC Storage and Feed System | Renee Fromme | Awarded |
10/22/2014 | 14-159 | 770 Pressure Zone - Bullitt County | Robin Heitz | Under Review |
10/8/2014 | 14-166 | Prospect Tank Demolition | Terri Conner | Awarded |
10/8/2014 | 14-164 | Concrete Paved Surfaces | Terri Conner | Awarded |
10/1/2014 | 14-162 | Minor Lane BPS Sodium Chlorite Feed System | Terri Conner | Awarded |
10/1/2014 | 14-167 | Copper Tubing | David Collier | Under Review |
9/24/2014 | 14-189 | Paving Restoration (Joint Bid w/ MSD Bid#14-0924) | Terri Conner | Awarded |
9/24/2014 | 14-163 | 34th Street Area Water Main REplacement Project | Renee Fromme | Awarded |
9/17/2014 | 14-160 | Cisco Network Equipment | Robin Heitz | Awarded |
9/17/2014 | 14-123 | 20-Inch Transmission Main to Hardin County Water District #2 | Robin Heitz | Under Review |
9/3/2014 | 14-141 | 690 Plan - Cedar Grove - South Booster Pumping Station | Terri Conner | Awarded |
9/03/2014 | 14-136 | Dreams End Drive Water Main Extension | Renee Fromme | Awarded |
8/27/2014 | 14-133 | Tank Coating Program - Blankenbaker Crossings and Jefferson Memorial Tanks | Terri Conner | Awarded |
8/27/2014 | 14-59 | B.E. Payne Lagoon No. 3 - Residual Removal | Renee Fromme | Awarded |
8/27/14 | 14-134 | B.E. Payne Water Treatment Plant Mixer Renovation | Robin Heitz | Awarded |
8/20/2014 | 14-142 | Cisco Maintenance Contract Renewals | Terri Conner | Awarded |
8/20/2014 | 14-137 | Steel Casing Pipe | David Collier | Under Review |
8/20/2014 | 14-100 | Pipe Repair Couplings | David Collier | Under Review |
8/13/2014 | 14-138 | Water Treatment Chemicals -Ft. Knox | Renee Fromme | Awarded |
8/13/2014 | 14-131 | Crescent Hill Pump Station Slate Roof Replacement and Masonry Improvements | Renee Fromme | Reject All Bids |
8/13/2014 | 14-128 | Allmond Distribution Center Garage Overhead Crane Replacement | Robin Heitz | Awarded |
8/13/2014 | 14-98 | Casing Spacers | David Collier | Under Review |
8/13/2014 | 14-99 | Rebar Anchors | David Collier | Under Review |
8/13/2014 | 14-129 | Propylene Glycol | David Collier | Under Review |
8/6/2014 | 14-117 | Water Treatment Chemicals | Renee Fromme | Awarded |
8/6/2014 | 14-126 | Salt River Booster Pumping Station - 690 Plan | Robin Heitz | Awarded |
8/6/2014 | 14-97 | Pipe Repair Sleeves | David Collier | Under Review |
8/6/2014 | 14-96 | Meter Setters | David Collier | Under Review |
8/6/2014 | 14-102 | Polywrap | David Collier | Under Review |
7/30/2014 | 14-87 | Watterson Expressway Area Lead Service Renewals | Terri Conner | Reject All Bids |
7/30/2014 | 14-127 | Louisville Water Company Pumping Station - 690 Plan | Terri Conner | Awarded |
7/23/2014 | 14-124 | Hydraulic, Machine and Gear Oils | Terri Conner | Awarded |
7/16/2014 | 14-119 | New Services | Renee Fromme | Awarded |
7/9/2014 | 14-114 | Bullitt County Extension Program Worldview Circle Area Main Extension | Renee Fromme | Awarded |
7/9/2014 | 14-118 | Reutlinger Avenue Area Lead Service Renewals | Terri Conner | Awarded |
7/9/2014 | 14-111 | Filter Drain Valve Replacement @ BEPWTP - Phase 3 | Robin Heitz | Awarded |
6/25/2014 | 14-113 | Edgeland Avenue Area Lead Service Renewals | Renee Fromme | Awarded |
6/25/2014 | 14-121 | Dreams End Drive Main Extension | Robin Heitz | Reject All Bids |
6/2/2014 | 14-112 | Rosewood Avenue Area Lead Service Renewals | Robin Heitz | Awarded |
6/25/2014 | 14-86 | Central Area - Northeast Area Lead Service Renewals | Terri Conner | Awarded |
6/18/2014 | 14-90 | Grinstead Drive Area Water Main Replacement Project | Robin Heitz | Awarded |
6/4/2014 | 14-85 | Wirth Avenue Area Lead Service Renewals | Terri Conner | Awarded |
5/28/2014 | 14-34 | B.E. Payne WTP & Crescent Hill WTP Liquid Ammonia Feed System | Renee Fromme | Awarded |
5/28/2014 | 14-02 | Customer Identification Verification Services | Robin Heitz | Under Review |
5/21/2014 | 14-79 | Berry Boulevard Area Lead Service Renewals Project | Robin Heitz | Awarded |
5/21/2014 | 14-01 | Crescent Hill Filter Plant / 480 Volt Distribution system Rehabilitation | Renee Fromme | Awarded |
5/14/2014 | 14-82 | Vehicle Wash Supplies | Robin Heitz | Awarded |
5/14/2014 | 14-75 | Cisco UCS Blade Servers | Robin Heitz | Awarded |
5/7/2014 | 14-77 | 10th Street Area MRRP | Renee Fromme | Awarded |
5/7/2014 | 14-31 | Swing Check Valves | David Collier | Under Review |
4/30/2014 | 14-47 | B.E. Payne Process Water and Storm Water Drainage Control and Sanitary Sewers | Renee Fromme | Awarded |
4/30/2014 | 14-60 | 22nd Street Area Water Main Replacement Project | Terri Conner | Awarded |
4/30/2014 | 14-44 | Plumbing Services | Robin Heitz | Awarded |
4/16/2014 | 14-46 | Brooks Hill Booster Pump Station | Renee Fromme | Awarded |
4/16/2014 | 14-56 | Crew Truck Underdeck Air Compressor/AC Generator | Renee Fromme | Awarded |
4/16/2014 | 14-54 | Crescent Hill Treatment Plant - Security Building and Grinstead Entrance Improvements | Robin Heitz | Under Review |
4/2/2014 | 14-30 | AVT Insertion Valves | David Collier | Under Review |
4/2/2014 | 14-28 | Valve Boxes | David Collier | Under Review |
4/2/2014 | 14-25 | Distribution System Repairs and Capital Improvements | Terri Conner | Awarded |
4/2/2014 | 14-41 | 770 Plan - Springdale Road PRV Station | Terri Conner | Awarded |
3/26/2014 | 14-43 | Water Bottles, 14 oz. and 22 oz. | Robin Heitz | Awarded |
3/26/2014 | 14-45 | REHAB - 24-Inch PCCP Cross County Header | Robin Heitz | Awarded |
3/12/2014 | 14-42 | Copper Tubing | David Collier | Under Review |
3/5/2014 | 14-23 | PVC Pipe | David Collier | Under Review |
3/5/2014 | 14-26 | Ductile Iron Pipe | David Collier | Under Review |
3/5/2014 | 14-24 | Temporary Booster Pumps | Terri Conner | No Bids |
3/5/2014 | 14-18 | Long Run Tank Demolition | Terri Conner | Awarded |
02/12/2014 | 14-19 | Long Run Tank Power and Telemetry Panel Relocation | Renee Fromme | Awarded |
02/12/2014 | 13-197 | Colliers Way & Mt. Elmira Rd. Grid Tie & PRV | Robin Heitz | Awarded |
02/05/2014 | 14-08 | Major Engine Transmission Repairs - One Ton and Over | Robin Heitz | Awarded |
02/05/2014 | 14-07 | Major Engine Transmission Repairs - Under One Ton | Robin Heitz | Awarded |
01/08/2014 | 13-151 | Sale of LWC Surplus Property | Carol Lyons | Under Review |
12/18/2013 | 13-101 | Print Utility & Mail Services | Renee Fromme | Final-Corrected |
12/11/2013 | 13-115 | Restraint Joint Adapters | David Collier | Under Review |
12/11/2013 | 13-116 | Gate Wheel Valves | David Collier | Awarded |
12/11/2013 | 13-117 | Ductile Iron Pipe Restraint Joint Pipe | David Collier | Under Review |
12/11/2013 | 13-118 | PVC Pipe | David Collier | Under Review |
12/11/2013 | 13-181 | Ball Park Tank Demolition | Terri Conner | Awarded |
12/4/2013 | 13-114 | Stone, Soil, Mfg Sand & Coarse Concrete Sand | David Collier | Under Review |
12/4/2013 | 13-113 | Ready Mix Concrete and Flowable Fill | David Collier | Under Review |
11/27/2013 | 13-148 | Equipment Rental - Louisville Water Tower | Renee Fromme | Awarded |
11/20/2013 | 13-180 | Communication System Maintenance | Renee Fromme | Awarded |
11/6/2013 | 13-175 | Steel Casing Pipe | David Collier | Under Review |
11/6/2013 | 13-119 | Polywrap | David Collier | Under Review |
10/23/2013 | 13-155 | Analytical Services For Drinking Water | Terri Conner | Awarded |
10/23/2013 | 13-170 | Bullitt County Extension Program - Nichols Hill Road Booster Pumping Station | Terri Conner | Awarded |
10/16/2013 | 13-165 | Ball Park Tank Demolition | Robin Heitz | Reject All Bids |
10/16/2013 | 13-168 | PVC Pipe | David Collier | Under Review |
10/16/2013 | 13-150 | REHAB - 60-inc RCP-Bluegrass, Hazelwood, and Manslick | Renee Fromme | Reject All Bids |
10/9/2013 | 13-145 | HVAC Maintenance | Renee Fromme | Awarded |
10/9/2013 | 13-162 | 48" Bell Joint Clamps | David Colier | Under Review |
10/9/2013 | 13-163 | Fifteen (15) Ton Trailer | Robin Heitz | Awarded |
10/2/2013 | 13-164 | Utility Service Body for 1 Ton Cab & Chassis | Terri Conner | Awarded |
10/2/2013 | 13-160 | Ten (10) Yard Dump Body | Robin Heitz | Awarded |
9/25/2013 | 13-149 | Water Treatment Chemicals for Fort Knox Facility | Renee Fromme | Under Review |
9/25/2013 | 13-156 | Contingency Contract for Motor Repairs | Robin Heitz | Awarded |
9/25/2013 | 13-154 | Vehicle Body and Suspension Repairs - Heavy Duty | Robin Heitz | Awarded |
9/25/2013 | 13-153 | Vehicle Body and Suspension Repairs - Light Duty | Robin Heitz | Awarded |
9/25/2013 | 13-143 | Road and Tire Service | Robin Heitz | Awarded |
9/18/2013 | 13-142 | Filter Drain Valve Replacement at B.E. Payne Water Treatment Plant Phase 2 | Terri Conner | Awarded |
9/4/2013 | 13-138 | Networking Upgrades and Replacements | Robin Heitz | Awarded |
9/4/2013 | 13-141 | Crescent Hill Water Treatment Plant Frankfort Avenue Wall Restoration | Renee Fromme | Awarded |
8/28/2013 | 13-89 | Freys Hill Booster Pumping Station Renovation | Renee Fromme | Awarded |
8/14/2013 | 13-107 | Crescent Hill Filter Plant Control Room Modifications | Robin Heitz | Awarded |
8/14/2013 | 13-135 | Ductile Iron Pipe Restraint Joint Pipe | David Collier | Under Review |
8/14/2013 | 13-134 | Bullitt County Water Improvement Program Walls Hollow Road North Grid Tie | Terri Conner | Awarded |
8/7/2013 | 13-112 | Brass Valves and Fittings | David Collier | Under Review |
8/7/2013 | 13-94 | Hydraulic, Machine and Gear Oils | Terri Conner | Awarded |
7/24/2013 | 13-03 | Employee Assistance Program Services | Carol Lyons | Awarded |
7/24/2013 | 13-106 | Water Treatment Chemicals | Carol Lyons | Awarded |
7/17/2013 | 13-104 | Crescent Hill Gate House and Gatekeepers House Improvements | Carol Lyons | Awarded |
7/17/2013 | 13-99 | Tank Coating Program 2013-Blankenbaker Crossings and Jefferson Memorial Tanks | Terri Conner | Reject All Bids |
7/10/2013 | 13-98 | Bullitt County Extension Program North and South Summitt Drive Booster Pumping Station | Terri Conner | Awarded |
7/10/2013 | 13-95 | 770 PZ Bayberry PRV Station Rebuild | Robin Heitz | Awarded |
7/3/2013 | 13-100 | Bullitt County Water Improvement Program Horse Run Court and Hill Creek Road Grid-Tie | Terri Conner | Awarded |
6/26/2013 | 13-93 | Gap-in-Knob Standpipe Demolition | Terri Conner | Reject All Bids |
6/19/2013 | 13-92 | Chilicoop Standpipe Demolition | Robin Heitz | Awarded |
6/19/2013 | 13-87 | I-65 Area Water Main Replacement Project | Robin Heitz | Awarded |
6/12/2013 | 13-90 | Lime Kiln Lane Water Main Replacement Project | Robin Heitz | Awarded |
6/12/2013 | 13-91 | Bullitt County Water Improvement Program Two-Thirds Majority Petition: Nichols Hill Road & Ables Mountain Lane | Robin Heitz | Awarded |
6/5/2013 | 13-88 | Lexington Road Area Lead Service Renewal | Terri Conner | Awarded |
6/5/2013 | 13-86 | Adams Hill Townhomes Water Main Replacement | Robin Heitz | Reject All Bids |
6/5/2013 | 13-82 | NACE 3 Consultants | Terri Conner | Awarded |
6/5/2013 | 13-81 | 2013 Cathodic Protection Installation Project | Terri Conner | Awarded |
6/5/2013 | 13-45 | Janitorial Services | Carol Lyons | Awarded |
6/5/2013 | 13-24 | B.E. Payne WTP Sodium Hypochlorite Generation Facilities | Carol Lyons | Awarded |
5/29/2013 | 13-85 | Heavy Equipment Rental | Carol Lyons | Awarded |
5/22/2013 | 13-58 | Copper Tubing | David Collier | Under Review |
5/15/2013 | 13-78 | Bullitt County Water Improvement Program 2/3's Majority Petition North and South Summit Drive 4-Inch Water Main Extension | Terri Conner | Awarded |
5/15/2013 | 13-74 | Navteq Data | Terri Conner | Awarded |
5/15/2013 | 13-70 | Lower Hunters Trace Water Main Replacement Project | Terri Conner | Awarded |
5/8/2013 | 13-75 | Cisco UCS Server | Robin Heitz | Awarded |
5/8/2013 | 13-72 | Sherwood Avenue Area Lead Service Renewals | Robin Heitz | Under Review |
5/1/2013 | 13-64 | Sodium Permanganate Feed System and Lime Dust Collection System at CHWTP | Carol Lyons | Awarded |
5/1/2013 | 13-17 | Plastic Meter Vaults and Elevator Rings | David Collier | Under Review |
5/1/2013 | 13-68 | Water Pressure Regulators | David Collier | Under Review |
5/1/2013 | 13-57 | 44th Street Area Water Main Replacement Project | Terri Conner | Awarded |
4/24/2013 | 13-66 | Inspection, Maintenance & Repair of Elevators at Louisville Water Company | Terri Conner | Awarded |
4/24/2013 | 13-63 | Oracle Workspace Optimization - John L. Huber Building | Terri Conner | Awarded |
4/24/2013 | 13-61 | Small Hand Tools | David Collier | Awarded |
4/10/2013 | 13-18 | Ductile Iron Fitting and Accessories | David Collier | Awarded |
4/10/2013 | 13-23 | Breckenridge Lane Water Main Grid-Tie Project | Robin Heitz | Awarded |
4/10/2013 | 13-19 | Aluminum Hatches | David Collier | Awarded |
4/3/2013 | 13-15 | Transmission System Repairs and/or Capital Improvements | Carol Lyons | Awarded |
4/3/2013 | 13-56 | Cement | David Collier | Under Review |
4/3/2013 | 13-50 | Bardstown Road Main Replacement | Robin Heitz | Awarded |
4/3/2013 | 13-54 | 2013 Shoring Box Purchase | Terri Conner | Awarded |
4/3/2013 | 13-47 | B.E. Payne Water Treatment Plant High Lift Building Area Improvements 12-Inch Yard Piping | Terri Conner | Awarded |
3/20/2013 | 13-44 | Powdered Activated Carbon for Ft. Knox | Carol Lyons | Awarded |
3/20/2013 | 13-32 | LWC Grid-Ties (Blankenbaker Pkwy & Woodfern Lane to Labor Way) | Robin Heitz | Awarded |
3/13/2013 | 13-30 | Uniforms for Union Staff | Robin Heitz | Awarded |
3/13/2013 | 13-26 | Ormsby Lane Water Main Replacement Project | Terri Conner | Awarded |
3/6/2013 | 13-25 | St. Anthony Woods Court and Easement 1932 Water Main Replacement Project | Terri Conner | Awarded |
3/6/2013 | 13-09 | Aiken Road Main Replacement Project | Terri Conner | Awarded |
2/27/2013 | 13-11 | Rolling Fields Water Main Replacement Project | Terri Conner | Awarded |
2/20/2013 | 12-118 | External Post-Tensioning Tendon Reapirs on Large Diameter PCCP Water Mains | Carol Lyons | Awarded |
2/13/2013 | 13-12 | 16" & 20" Restraint Joint Clamps | David Collier | Awarded |
2/13/2013 | 13-13 | I-265 Bridge (East End) Water Main Relocation Project | Terri Conner | Awarded |
1/30/2013 | 12-106 | Carbon Fiber-Reinforced Polymer Repairs on Large diameter Water Mains | Carol Lyons | Awarded |
1/23/2013 | 13-02 | Maintenance, Repair and Supplies for Konica / Minolta Multifunction Machines | Carol Lyons | Awarded |
1/9/2013 | 13-06 | Tapping Sleeves with MJ Outlets | David Collier | Awarded |
1/9/2013 | 12-99 | PVC Pipe | David Collier | Awarded |
1/9/2013 | 12-148 | Ductile Iron Pipe | David Collier | Awarded |
1/9/2013 | 12-145 | Restraint Joint Clamps | David Collier | Awarded |
1/9/2013 | 12-205 | Water Fill Stations Upgrade Project | Robin Heitz | Under Review |
12/12/2012 | 12-151 | Brass Valves and Fittings | David Collier | Under Review |
12/12/2012 | 12-181 | Drain Valves for BEPWTP Filters (Phase 1) | Robin Heitz | Awarded |
11/28/2012 | 12-178 | Bottle Blow Moulding Machine | Terri Conner | Reject all bids |
11/14/2012 | 12-139 | Fire Hydrants | David Collier | Under Review |
11/14/2012 | 12-190 | Major Engine and Transmission Repairs - Under One Ton | Robin Heitz | Awarded |
11/14/2012 | 12-191 | Major Engine and Transmission Repairs - One Ton and Over | Robin Heitz | Awarded |
11/14/2012 | 12-78 | Louisville Water Company Pumping Station #1 Restoration Tax Credit | Terri Conner | Awarded |
11/7/2012 | 12-192 | BE Payne Water Treatment Plant High Lift Building Area Improvements | Terri Conner | Reject all bids |
10/24/2012 | 12-146 | Ready Mix Concrete & Flowable Fill | David Collier | Under Review |
10/24/2012 | 12-147 | Valve Meter Box Maintenance | David Collier | Under Review |
10/24/2012 | 12-172 | Bullitt County AMR Installation Project | Carol Lyons | Awarded |
10/17/2012 | 12-179 | Taylorsville Road - Chenoweth Run Road Project | Terri Conner | Awarded |
10/10/2012 | 12-176 | Restoration Construction of Asphalt and Concrete Paved Surfaces | David Collier | Under Review |
10/10/2012 | 12-144 | Barricade Rentals | David Collier | Under Review |
10/3/2012 | 12-177 | Water Treatment Chemicals for Ft. Knox | Carol Lyons | Awarded |
9/26/2012 | 12-171 | Zorn Pump Station #1 Interior Restoration | Terri Conner | Awarded |
9/26/2012 | 12-175 | Taylorsville Master Meter #1 Renovation | Terri Conner | Awarded |
9/19/2012 | 12-156 | Preston Highway 16" Transmission Main - Hwy 245 to Belmont Road | Terri Conner | Awarded |
9/19/2012 | 12-112 | Electrical Switchgear Cleaning... | Carol Lyons | Under Review |
9/12/2012 | 12-158 | CISCO Maintenance | Carol Lyons | Awarded |
9/12/2012 | 12-143 | Rebar Anchors | David Collier | Under Review |
9/12/2012 | 12-142 | Casing Spacers | David Collier | Under Review |
9/12/2012 | 12-150 | Pipe Repair Couplings | David Collier | Under Review |
9/12/2012 | 12-152 | Outer Loop and Melda Drive Main Replacement Project | Terri Conner | Awarded |
9/12/2012 | 12-153 | LaGrange Road Main Replacement Project | Terri Conner | Awarded |
9/12/2012 | 12-115 | Vehicle Body and Suspension Repair - Light Duty | Robin Heitz | Awarded |
9/12/2012 | 12-114 | Vehicle Body and Suspension Repair - Heavy Duty | Robin Heitz | Awarded |
9/12/2012 | 12-113 | Road and Tire Service | Robin Heitz | Awarded |
9/12/2012 | 12-83 | Wolf Pen Branch Phase II Transmission Main | Carol Lyons | Awarded |
9/5/2012 | 12-108 | North Buckman Street Main Replacement and Pressure Reducing Station Project | Carol Lyons | Awarded |
9/5/2012 | 12-140 | Pipe Repair Sleeves | David Collier | Under Review |
9/5/2012 | 12-138 | Meter Setters | David Collier | Under Review |
9/5/2012 | 12-137 | Sale of Scrap Metal | David Collier | Under Review |
8/29/2012 | 12-134 | JLH Building New Boiler | Robin Heitz | Awarded |
8/29/2012 | 12-132 | 2012 Cathodic Protection Installation Project | Terri Conner | Awarded |
8/29/2012 | 12-133 | NACE 3 Consultant | Terri Conner | Awarded |
8/22/2012 | 12-135 | Meter Plug Locks | David Collier | Under Review |
8/22/2012 | 12-130 | Taylorsville Road Main Replacement Project | Terri Conner | Awarded |
8/22/2012 | 12-117 | John L Huber Building Emergency Operations Center | Terri Conner | Awarded |
8/8/2012 | 12-116 | Water Treatment Chemicals | Carol Lyons | Awarded |
8/8/2012 | 12-98 | Horizontal Directional Drilling | Terry Atwell | Awarded |
7/18/2012 | 12-62 | Swing Check Valves | David Collier | Under Review |
7/18/2012 | 12-85 | New Services | Carol Lyons | Awarded |
7/11/2012 | 12-107 | Shelbyville Road Main Replacement Project | Terri Conner | Awarded |
7/11/2012 | 12-96 Corrected |
Wireless Network Switch Replacements for Allmond Ave., and Crescent Hill Filter Plant (CHFP) | Carol Lyons | Awarded |
7/11/2012 | 12-61 | Barricades, Lights and Traffic Cones | David Collier | Under Review |
7/11/2012 | 12-89 | LWC Property Protection Services | Carol Lyons | Awarded |
7/11/2012 | 12-104 | Steel Casing Pipe | David Collier | Under Review |
7/11/2012 | 12-102 | Copper Tubing | David Collier | Under Review |
6/27/2012 | 12-95 | Millers Lane and Dixie Highway Water Main Replacement Project | Terri Conner | Awarded |
6/20/2012 | 12-94 | Rose Island Road Water Main Extension Project | Terry Atwell | Awarded |
6/20/2012 | 12-88 | Truck Service Body | Terri Conner | Awarded |
6/20/2012 | 12-87 | Utility Service Body for 1 Ton Cab & Chassis | Terri Conner | Awarded |
6/6/2012 | 12-34 | Vehicle Wash Supplies | Carol Lyons | Awarded |
6/6/2012 | 12-33 | Heavy Equipment Rental | Carol Lyons | Awarded |
6/6/2012 | 12-86 | Crew Truck 33,000 GVWR Cab Chassis and Tandem Dump Truck 52,000 GVWR Cab Chassis | Carol Lyons | Awarded |
5/30/2012 | 12-80 | Elevator and Structural Slab Rehabilitation for Crescent Hill Zorn Pump Station Boiler Buildings | Terry Atwell | Awarded |
5/30/2012 | 12-84 | West Blue Lick Road Water Main Replacement | Carol Lyons | Awarded |
5/23/2012 | 12-82 | Poplar Level Road and Hess Lane Water Main Replacement Project | Terri Conner | Awarded |
5/16/2012 | 12-52 | Hydraulic, Machine and Gear Oils | Terri Conner | Awarded |
5/16/2012 | 12-79 | Reamers Road Water Main Replacement Program | Terri Conner | Awarded |
5/2/2012 | 12-57 | Ductile Iron Pipe Fittings With Accessories | David Collier | Under Review |
5/2/2012 | 12-73 | Southside Drive and Iroquois Avenue | Terry Atwell | Under Review |
5/2/2012 | 12-59 | Aluminum Hatches | David Collier | Under Review |
5/2/2012 | 12-58 | Tapping Saddles | David Collier | Under Review |
5/2/2012 | 12-54 | Plastic Meter Vaults and Elevator Rings | David Collier | Under Review |
4/25/2012 | 12-72 | Philips Lane and Preston Highway Water Main Replacement Project | Terri Conner | Awarded |
4/4/2012 | 12-47 | De-chlorination Facilities at CHWTP & BEPWTP | Carol Lyons | Awarded |
4/4/2012 | 12-68 | Old Harrods Creek Road and Tucker Station Road Water Main Replacement | Carol Lyons | Awarded |
3/28/2012 | 12-41 | Oak Street Area Lead Service Renewals | Terri Conner | Awarded |
3/28/2012 | 12-05 | Cold Water Meters | Terry Atwell | Under Review |
3/21/2012 | 12-40 | Mary Street Area Lead Service Renewals | Terry Atwell | Awarded |
3/21/2012 | 11-199 | Distribution System Repairs & Capital Improvements | Terry Atwell | Awarded |
2/29/2012 | 12-29 | Overlook Acres Booster Pump Station | Terry Atwell | Awarded |
2/29/2012 | 12-08 | Security Services | Carol Lyons | Awarded |
2/29/2012 | 11-47 | Transylvania Beach Sanitary Sewer | Carol Lyons | Awarded |
2/24/2012 | 12-13 | Westside Drive Main Replacement Project | Terry Atwell | Awarded |
2/15/2012 | 12-12 | Shelby Street Area Service Renewals Project | Terry Atwell | Awarded |